Marine Corp Logistics Base | Albany, Georgia

National Roof Drainage was contacted by several roofing contractors to remove and replace the existing roof drains. Each building had 40 existing roof drains that connected to 6” cast-iron pipe, with a total of 18 buildings. We are unable to tell you the contents of the building for security reasons, however, they were loaded, these made it very difficult to access the underside of the roof deck to access the drains.

Each building was 220,000 SF. • Replaced 720 Roof Drains

Total Contract: $1,280,400.00 | Completion Time: 86 calendar days

MCLB Albany Warehouses.jpg
GINA DRAGO FREY